autocast universal
®
230 Casting System Crowns and bridges Stand 1.9. 03 A 7
Mixing
Important!
Use only clean, dry mixing bowls and measuring beakers!
Always keep mixing bowls and measuring beakers away
from other investment materials!
After mixing powder and liquid, mix the compound well
by hand.
Mixing time in vacuum mixer:
Minimum 60 secs. Recommended 120 secs.
Processing Time
Approx. 6 minutes.
Setting Time / Trimming
1
1
/2 -2 hours, depending on room temperature.
Grinding
Grinding/sanding the ring surface improves its thermal
stability.
Waiting Time
rematitan
®
Ultra investment material is sensitive to dryness.
Therefore, it should not be allowed to stand for too long
(recommended: less than 5 min.) and should be placed in a
cold oven.
If longer holding times cannot be avoided, protect the ring
from drying out by placing it in a plastic bag or sealing it
with wax.